Description Fee (2018)
Bid Books for Jobs $50
Storm Water Permit Review $500.00 up to 5 acres
  $850 5 acres to 10 acres
  $75.00 per acre 10 acres and above
Stormwater Construction Inspection - fee due at the start of pre-construction/start up meeting $500.00 up to 5 acres
  $850 5 acres to 10 acres
  $75.00 per acre 10 acres and above
  pdf Public Improvement Permit (144 KB) $500.00 per permit
       Technical Review 4% of estimated cost
       Inspection 10% of estimated cost
Subdivision Application Review $500.00 for 1st acre
  $50.00 per additional acre
  pdf Floodplain Development Permit (28 KB) $500.00 for 1st acre
  $150.00 per additional acre
  pdf Excavation, Removal or Storage of Materials Permit (38 KB) $500.00 for 1st acre
  $50.00 per additional acre